House in Lower Grand Lagoon, FL
Reasons to book
About this house rental
Experience incredible savings on your extended stays with our specially crafted accommodation packages.
The Space:
Whether you're planning a week-long getaway, a flexible multi-week stay, or a month of indulgence, we've got you covered. Enjoy unbeatable discounts on our Weekly (7 days), Multi-Weekly (7, 14, or 21 days), and Monthly (28 nights) options. Immerse yourself in comfort, convenience, and relaxation while making the most of your time away. Don't miss out on this fantastic opportunity to create lasting memories without breaking the bank. Book now and seize the chance to embrace a worry-free escape!
Experience the best of Panama City Beach with a stay at Beach Time! This cozy 3-bedroom home offers an idyllic retreat that puts you just a quick walk away from sugar white sand and sparkling Gulf waters. Enjoy warm Florida days on the home’s upper-level deck, complete with outdoor seating and dining areas to soak in the sun and enjoy the fresh coastal breeze. Beach Time’s quaint coastal style makes it easy for guests to feel right at home while exploring local restaurants and boutiques nearby. Every detail has been expertly crafted to provide an unforgettable beach getaway!
Relax with your crew in the living room featuring comfortable seating and a smart TV, while the lucky chef gets to enjoy working their magic in the adjacent kitchen. This home is fully equipped for all culinary needs - from stainless steel appliances to coffee maker and cookware – ensuring an effortless preparation of beachside picnics or family-style meals to share at the dining table. And don't forget about movie nights either; snuggle up around another smart TV downstairs on cozy couches. Finish off your days outside under sunset skies at our ground-level patio equipped with grill and picnic table—perfect for BBQs and al fresco meals!
This home sleeps 8 guests between 3 private bedrooms and a full size sleeper sofa.
- Bedroom #1 has a king size bed and smart tv.
- Bedroom #2 has a king size bed, smart tv, and ensuite bathroom with shower/tub combo.
- Bedroom #3 has a king size bed and ensuite half-bathroom.
THINGS TO NOTE:
- 0.2mi to beach.
- The home has an additional bathroom with shower/tub combo.
- Washer and dryer in unit.
- Parking space for up to 4 vehicles is available in the driveway.
- A 24-hour supply of household amenities is included with the stay to get your vacation started!
Located in the heart of the Florida Panhandle, Panama City Beach is a popular vacation destination and it’s easy to see why. With more than 27 miles of coastline, PCB is known for its white, sandy beaches and stunning ocean views. Life is organized around the unbeatable beaches with delicious food, inspired shopping, and live entertainment up and down the coast. There is something for everyone in your group to enjoy from PCB’s 4 championship golf courses to the weekly Grand Lagoon Waterfront Farmers Market and epic chartered fishing trips.
Please note that requests for late checkout must be received no later than 10:00 AM local time on the day prior to your departure. Early check-in and late checkout are based on availability and require approval, and may be subject to an additional fee of up to $60.00 depending on the number of additional hours requested. Please feel free to contact us if you are interested in arranging.
The Neighborhood:
★FREE ACTIVITIES INCLUDED DAILY*★
Grand Welcome partners with trusted local providers to bring added value and memorable experiences to your stay in Panama City Beach.
For each day of your vacation, you will receive one complimentary ticket to select local activities. Options range from water adventures and sightseeing tours to family-friendly attractions and entertainment experiences.
Here’s a look at what may be available during your stay:
ON THE WATER + COASTAL EXPERIENCES
✔ Jet Ski Dolphin Adventure Tour
✔ Sunset and Dolphin Watch Sailing Cruise (2 hours) [𝙁𝙍𝙀𝙀]
✔ Shell Island Snorkel and Sailing Cruise (3 hours)
✔ 2-Hour and 3-Hour Dolphin Boat Tours
✔ Sandbar Cruise (3 hours)
✔ Lagoon Cruise and Sunset Cruise (1.5 hours)
✔ Glow Tiki Night Cruise experience
AIR + SCENIC TOURS
✔ Intro Helicopter Tour (short scenic ride)
✔ Miracle Strip Helicopter Tour
✔ Emerald Coast Helicopter Tour
✔ Gulf Lagoon Helicopter Tour
✔ Shell Island Helicopter Tour
✔ Extended scenic routes including Run to the Pass and Breakfast Point
FAMILY ATTRACTIONS + ENTERTAINMENT
✔ WonderWorks Adventure Tickets (interactive exhibits, ropes course, laser tag)
✔ Ripley’s Believe It or Not! admission
✔ Pirates Voyage Dinner and Show (live performance with dinner)
✔ Rainforest Black Light Mini Golf and Arcade [𝙁𝙍𝙀𝙀]
✔ Trampoline Park access (30,000 sq ft indoor park) [𝙁𝙍𝙀𝙀]
✔ Mirror Maze, Laser Tag, Laser Vault, and Bazooka Ball experiences
✔ Dave and Buster’s: $20 Power Card
✔ Royal Escape Rooms at the Shoppes At Edgewater/ At Pier Park
✔ Axe Throwing at the Shoppes At Edgewater
OUTDOOR + ACTIVE EXPERIENCES
✔ Windswept Dunes Golf Club (18-hole championship course) [𝙁𝙍𝙀𝙀]
✔ Bay Point Golf Club (Nicklaus Design course) [𝙁𝙍𝙀𝙀]
✔ Discover Scuba Diving experience (beginner-friendly)
✔ Bike rentals with optional child add-ons
✔ Paddleboard rentals
✔ Beach gear rentals
✔ Golf cart rentals
✔ $25 Wongo Card to Swampy Jack's
THRILL RIDES + ADVENTURE PARKS
✔ Scream Machine thrill ride
✔ Swampy Jack’s Adventure Park credit (rides, mini golf, go-karts)
✔ Shipwreck Island Waterpark admission
SCENIC + RELAXED EXPERIENCES
✔ PCB Wheel ride with panoramic views
✔ Sunset Dinner Cruise aboard the SOLARIS yacht with live music
After booking, you will receive a full list of available activities for your travel dates along with simple instructions on how to reserve your included tickets.
*Unused tickets expire daily. Complimentary admission applies to one activity per day, per reservation. Additional guests may pay regular rates. Availability varies by season and provider. Not valid for stays of 28 nights or longer. Participation is optional.
Other Things to Note:
You must be 25 years old to rent out the property.
Amenities at Beach Time | Walk to Gulf, Deck, Grill | Daily Activity Deals
Map of Lower Grand Lagoon, FL
